Chino Hills documents its water-heater requirements in a handout of its own, and reading it before the work is the fastest way to understand what an installation here involves. The city is specific about forms, and the forms are specific about where the unit may sit.
The submittal, in order
Before a permit issues, the city asks for a completed building application and a completed California Energy Commission CF-1R-ALT form — the alteration compliance document for a water heater. A site plan joins them in two cases: the unit is going outside the conditioned space, or its indoor location is changing.
At the final inspection the inspector collects a completed CF-6R-MECH-01, the mechanical compliance form. On residential projects valued at $1,000 or more the city also wants its smoke-detector and carbon-monoxide form, which a change-out normally meets on value alone.
Applications run through the city's online Virtual Development Services portal, and the Building and Safety Division answers questions about a specific property.
Why the site-plan trigger matters
The site plan is the fork in the road. A unit going back where the old one stood, indoors, needs no drawing. A unit moving outdoors, or moving within the house, needs one — because the city is being asked to approve a location, not just a swap.
For a homeowner, that means the design decision comes before the paperwork rather than after. Choosing an exterior wall for a tankless unit, or moving a tank out of a closet, changes the submittal and adds a step.
Sizing and fuel, in plain terms
A tank is picked on stored volume plus recovery: how much hot water is ready, and how fast it is replaced. A household with several bathrooms and a laundry drawn together needs recovery more than a larger tank.
A tankless unit is picked on temperature rise at the flow being drawn, and in winter the incoming water is colder, so the same unit delivers less. Sizing on a summer figure is how a conversion ends up disappointing its owner in January.
Fuel decides the rest. Gas capacity constrains a tankless conversion, because the unit fires at several times a tank's input. Electric resistance is cheap to install and costly to run. A heat-pump unit needs space, condensate drainage and usually an electrical circuit.
The safety items the inspection is looking for
Straps in the upper and lower thirds of the unit with at least 4 in. clear above the controls, per CPC 507.2. A listed temperature-and-pressure relief valve whose discharge line is at least the valve's outlet size, runs outside, and carries no shutoff or trap. Expansion control where a check valve or backflow preventer closes the system. A sediment trap on the gas line. Working space around the unit. Ignition sources lifted 18 in. in a garage, or an approved compartment with outside air.
On this city's handout those items are listed as what the inspector verifies, so they are not a matter of preference.
Water and the unit's future
Hardness here runs high. San Gabriel Valley Water Company's 2025 report averages 234 ppm regionally, within a 189–280 ppm range, and heated water leaves that mineral load behind as scale. A new unit installed without a flush schedule inherits the old one's timeline.
What is not quoted here
The city's current permit fees are set by its own schedule and were not confirmed for this page, so no figure appears. The sequence is settled: design, submittal, permit, installation, inspection.